#Nasa space shuttle landing schedule free
Five ALT free flights and 54 operational Space Shuttle missions landed on Edwards Air Force Base runways, making a total of fifty-nine. During the renovation of 04/22, a temporary runway (with the same designation) was constructed parallel to it and used for one landing ( STS-126). Of the concrete strips, the main Runway 04/22 was utilized. Space shuttle landings on the lake bed took place on Runways 05/23, 15/33 and 17/35. Several runways are arrayed on the dry lakebed at Rogers Dry Lake, and there are also concrete runways. Thirty-six missions landed on Runway 15 and forty-two missions landed on Runway 33, accumulating a total of 78 missions. The first landing at the SLF was for mission STS-41B in 1984 landings were suspended at the site following brake damage and a blown tire during the STS-51D landing in 1985, and resumed in 1990. It is designated Runway 15 or 33, depending on the direction of use.
![nasa space shuttle landing schedule nasa space shuttle landing schedule](http://www.americaspace.com/wp-content/uploads/2014/08/Orion-EFT-1-Back-Shell-Install-1.jpg)
The Shuttle Landing Facility at the Kennedy Space Center in Florida has a single 15,000-foot (4,600 m) concrete runway, 15/33.
![nasa space shuttle landing schedule nasa space shuttle landing schedule](https://apod.nasa.gov/apod/image/1108/atlantisfalloff_nasa_900.jpg)
Discovery lands at Kennedy Space Center for the last time, March 2011